Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
The Chengyu Central Line High-Speed Rail Jingkou Jialing River Bridge is completed today.
A reporter learned from the China Railway Chengdu Bureau Group that at around 10:00 a.m. on March 31, with the completion of welding on the last segment’s weld seam in the new steel box girder closure segment, the newly built Chengdu–Chongqing high-speed railway on the Chengdu–Chongqing Central Line (hereinafter referred to as the Chengdu–Chongqing Central Line high-speed railway) successfully completed the entire-line control project—the Jingkou Jialing River Extra-Large Bridge—by locking it in smoothly. This marks that all the bridges along the Chengdu–Chongqing Central Line high-speed railway have been fully joined throughout the line, laying a solid foundation for the railway to open on schedule. The Jingkou Jialing River Extra-Large Bridge is one of the key and most difficult control projects on the Chengdu–Chongqing Central Line. The bridge is 1,294.3 meters long and is the double-tower cable-stayed bridge with the largest span on the entire Chengdu–Chongqing Central Line. (CCTV News)